Acoustic performance is coordinated in line with the project’s acoustic consultant and building specification.

Measures may include:

  • Concrete or lightweight base selection to support mass requirements
  • Isolation detailing between pod base and structural slab
  • Coordination with surrounding floor build-up and ceiling systems
  • Alignment with Part E performance targets where applicable

Acoustic performance is addressed as part of integrated design review to ensure compatibility with the building’s overall acoustic strategy.

Other FAQs

What are typical wall and base thicknesses?

The pod construction is finalized during the design coordination phase. Available base options include a standard concrete base (approximately 2400 kg/m³), a lightweight concrete base (approximately 1800 kg/m³), and steel/tubular structural alternatives for projects with weight restrictions. Typical floor build-ups are around 90 mm for the standard configuration and 110 mm for walk-in shower or embedded drainage configurations. These dimensions include 10 mm neoprene support pads and a minimum 5 mm leveling tolerance. Final dimensions are provided in approved-for-construction drawings before manufacturing begins.

Find out more >

What site preparation is required?

The site preparation for pod installation requires a level and structurally verified floor slab, with marked neoprene support locations. Recessed installations must be coordinated early in the design phase. Neoprene pads help accommodate minor tolerances and ensure proper alignment with surrounding floor finishes.

Find out more >

What maintenance is required after handover?

After handover, pod maintenance is similar to conventional bathrooms but simplified through design features such as centralised service ducts, accessible connections, and removable plumbing components. A project-specific O&M manual supports efficient lifecycle management.