Average unloading time: approximately 10 minutes per unit.
Method dependent on:
- Crane lift (top unloading)
- Forklift lateral unloading
This supports controlled logistics within constrained urban sites.
Other FAQs
What site preparation is required?
The site preparation for pod installation requires a level and structurally verified floor slab, with marked neoprene support locations. Recessed installations must be coordinated early in the design phase. Neoprene pads help accommodate minor tolerances and ensure proper alignment with surrounding floor finishes.
How are pods moved safely on site?
Pods are safely moved on site using certified lifting systems, including lifting bushings and defined anchor points. Depending on weight and configuration, handling may involve cranes or forklifts. The lifting strategy is agreed in advance to ensure safe installation.
What installation rate can typically be achieved on a high-rise project?
Bathroom pod installation rates on high-rise projects depend on logistics, crane access, and floor sequencing, typically aligning with one floor cycle per structural progression.