Documentation is managed through defined design, manufacture and inspection stages.

Information typically includes:

  • Approved-for-construction drawings
  • Inspection and quality control records
  • Service testing results
  • Product and material traceability where required
  • As-built documentation

Records can be integrated into the project’s digital information management system to support long-term building records.

Other FAQs

How are pods labelled and tracked?

Each pod is assigned a unique serial number to ensure full traceability throughout manufacture, delivery, installation, and quality assurance processes. This system supports floor allocation verification and maintains compliance with Golden Thread documentation requirements.

Find out more >

How are Testing & Inspection (T&I) stages structured?

Testing and inspection are carried out in two stages: factory verification before dispatch and on-site inspection and functional testing after installation and service connection. All inspection records are documented and can be integrated into the project’s digital QA system to ensure full traceability and accountability.

Find out more >

What quality management systems are in place?

Bathroom pods are produced under ISO 9001 quality management systems, including defined production inspections, dimensional checks before dispatch, photographic documentation, and non-conformity reporting. Additional certifications may apply based on project requirements, with documentation supporting traceability and the Golden Thread.

Find out more >