Late-stage changes are managed through formal variation control.

Changes are reviewed for:

  • Structural impact
  • Service coordination
  • Compliance implications
  • Programme effect

Where necessary, updated drawings and documentation are issued prior to manufacture or installation to maintain alignment with approved design information.

Other FAQs

How are pods integrated into Gateway 2 and Gateway 3 processes?

For Gateway 2 and Gateway 3 processes, Sterchele supports compliance by providing coordinated technical information, including design drawings, specifications, factory inspection records, MEP testing certification, and as-built documentation. These outputs assist the Principal Designer and Principal Contractor, while Sterchele does not handle submissions directly.

Find out more >

What are typical wall and base thicknesses?

The pod construction is finalized during the design coordination phase. Available base options include a standard concrete base (approximately 2400 kg/m³), a lightweight concrete base (approximately 1800 kg/m³), and steel/tubular structural alternatives for projects with weight restrictions. Typical floor build-ups are around 90 mm for the standard configuration and 110 mm for walk-in shower or embedded drainage configurations. These dimensions include 10 mm neoprene support pads and a minimum 5 mm leveling tolerance. Final dimensions are provided in approved-for-construction drawings before manufacturing begins.

Find out more >

How is fire performance managed within the pod and at service interfaces?

Fire performance requirements are addressed during the design development phase in line with the project’s fire strategy. This includes selecting materials that meet specified fire classifications, coordinating service penetrations, aligning with the Principal Contractor’s fire-stopping strategy, and clearly defining responsibilities between the pod manufacturer and building envelope contractor. Sterchele supports compliance by providing technical information and material data but does not act as the fire strategy designer. All interface coordination is completed before manufacturing to ensure dimensional accuracy and regulatory compliance.

Find out more >