Fire performance is addressed during coordinated design development in alignment with the project fire strategy.

This includes:

  • Material selection in accordance with specified reaction-to-fire classifications
  • Coordination of service penetrations within defined interface boundaries
  • Alignment with the Principal Contractor’s fire-stopping strategy
  • Clear scope definition between pod manufacturer and building envelope contractor

Sterchele does not act as fire strategy designer but provides structured technical information and material data to support compliance with Part B requirements.

Interface coordination is completed prior to manufacture to maintain dimensional accuracy and regulatory alignment.

Other FAQs

What UK standards and regulations do bathroom pods comply with?

Sterchele bathroom pods are designed in line with UK Building Regulations and project-specific requirements, including Parts A, B, G, H, and M where applicable. Compliance is ensured through material selection, coordinated design reviews, and documented inspections.

Find out more >

Can bathroom pods include windows or non-standard door configurations?

Window and door openings are pre-formed during manufacturing, including the option for full-height and sliding systems. Subframe alignment is coordinated with the pod wall and façade build-up. All penetrations and structural modifications are planned before production to ensure dimensional accuracy, compliance, and proper integration with the building envelope.

Find out more >

Who is responsible for connections between the pod and building services?

Responsibility for pod-to-building service connections is defined by the project scope. Typically, Sterchele manufactures and tests the pod, while the appointed M&E contractor completes on-site connections. Interface roles are coordinated during design to ensure alignment, with Sterchele supporting inspections when included in the scope.

Find out more >