Responsibility for final service connections is defined within the agreed project scope and contractual arrangements.
Typically:
- Sterchele manufactures and factory-tests the bathroom pod prior to delivery.
- The appointed M&E contractor completes the final on-site service connections.
- Where included within the agreed scope, Sterchele attends defined inspection stages following installation and/or connection to support verification and integration review.
Interface responsibilities are clarified during design coordination to ensure alignment between the pod scope and the building’s structural and MEP strategy.
Sterchele does not assume responsibility for services beyond the defined package scope, but supports coordinated verification procedures where agreed.
Other FAQs
How is fire performance managed within the pod and at service interfaces?
Fire performance requirements are addressed during the design development phase in line with the project’s fire strategy. This includes selecting materials that meet specified fire classifications, coordinating service penetrations, aligning with the Principal Contractor’s fire-stopping strategy, and clearly defining responsibilities between the pod manufacturer and building envelope contractor. Sterchele supports compliance by providing technical information and material data but does not act as the fire strategy designer. All interface coordination is completed before manufacturing to ensure dimensional accuracy and regulatory compliance.
How are pods integrated into Gateway 2 and Gateway 3 processes?
For Gateway 2 and Gateway 3 processes, Sterchele supports compliance by providing coordinated technical information, including design drawings, specifications, factory inspection records, MEP testing certification, and as-built documentation. These outputs assist the Principal Designer and Principal Contractor, while Sterchele does not handle submissions directly.
How are Testing & Inspection (T&I) stages structured?
Testing and inspection are carried out in two stages: factory verification before dispatch and on-site inspection and functional testing after installation and service connection. All inspection records are documented and can be integrated into the project’s digital QA system to ensure full traceability and accountability.