Key Project Data
- Location: Victoria Square, Woking, UK
- Sector: High-rise residential
- Development type: Mixed-use urban regeneration
- Buildings: Two residential towers (30 and 34 storeys)
- Total apartments: 429
- Bathroom pods supplied: 755 prefabricated units
- Sterchele scope: Design coordination, off-site manufacture, sequenced delivery, and on-site technical integration support through installation and commissioning


The Challenge
The residential towers at Victoria Square rise 30 and 34 storeys within a dense mixed-use masterplan delivered in a constrained town-centre environment.
At this height and volume, bathroom installation must align precisely with structural tolerances, vertical service risers, and floor-by-floor construction sequencing. A traditional in-situ approach would have required multiple trades operating concurrently across repeated floor plates, increasing coordination demand within vertical cores and residential fit-out zones.
The project required a controlled installation strategy capable of maintaining programme reliability while ensuring consistent dimensional and finish standards across 429 high-spec apartments.
Our Solution
Sterchele engineered, manufactured, and delivered 755 fully prefabricated bathroom pods for the two residential towers, structured to align with the project’s high-rise installation sequence.
Our involvement included:
- Detailed design coordination to align pod geometry with structural grids and façade tolerances
- Interface alignment with drainage, ventilation, containment, and riser strategies
- Factory-controlled manufacture with defined inspection and dimensional verification stages
- Sequenced delivery aligned to tower-by-tower and floor-by-floor progression
- On-site technical presence during installation and commissioning to support coordinated service integration and verification
The bathroom package was incorporated as a planned modular element within the wider construction programme.


Why Prefabricated Pods Were Effective
On tall residential buildings of this scale, prefabrication provided operational clarity:
- Consolidation of multi-trade bathroom works into a single manufactured unit
- Repeatable installation methodology across 30+ storeys
- Reduced labour intensity within vertical circulation areas
- Standardised quality verification prior to delivery
- Installation sequencing aligned with structural and fit-out progression
The bathroom scope transitioned from dispersed trade activity to a coordinated modular installation strategy.
Outcome
The use of prefabricated pods transformed bathroom delivery from variable, multi-trade on-site construction to a controlled and repeatable modular process across both towers.
This supported:
- Programme predictability aligned with high-rise sequencing
- Reduced vertical trade congestion during peak installation phases
- Consistent dimensional and finish standards across 755 units
- Clear interface coordination between pod services and the building’s infrastructure
By integrating design coordination, manufacture, delivery, and on-site technical support within a single structured scope, the bathroom package was delivered as a coordinated system aligned with the demands of tall residential construction.

Share
Learn more about bathroom pods in the UK
To learn more about the Group and our way of working, download our Company Profile by filling out the form with your details.